Utilities Strategy & Design

Designs that get built, not redrawn.

Compliant, coordinated multi-utility design that sets your project up for delivery from day one.

Most utility problems on site start on paper. Clashes missed in design, services that don’t meet authority requirements, or staging that can’t work in the field all turn into rework, delays and cost.

Our specialist front-end team brings utilities design, electrical design and constructability advice together from the start. The result is one coordinated, risk-aware design foundation that authorities can approve and contractors can build.

Core Capabilities

Utilities design

Water, sewer, stormwater, gas, telecommunications and electrical, with full clash analysis across every service.

Electrical design (ASP Level 3)

Transmission and distribution, lighting, systems, safety and documentation.

Constructability advisory

Early-stage reviews of staging, methodology and risk, so issues are found before they reach site.
Capabilitiy in practice

Our Utilities Strategy & Design Work

New Albion Station

Client

Martinus Rail

Project Value

Engagement Period

Oct 2025 - Present

Project Overview

The Queensland Department of Transport and Main Roads is rebuilding Albion Station in Brisbane's inner north as a rail-to-rail interchange, ahead of Cross River Rail services. The new station will have four wider, raised platforms, an elevated southern concourse, a northern pedestrian overbridge, and a modern station building with lifts, accessible facilities and improved passenger amenities.

Henderson Road and Raglan Street Cycleway – Lighting Audit and ASP3 Design

Client

JPE Group

Project Value

Engagement Period

Apr 2026 – Ongoing

Project Overview

This is a project from City of Sydney to extend the cycleway connection along Henderson Road and Raglan Street between the existing cycleway at the intersection of Davy/Mitchell Road and the existing cycleway at George Street. The project aims to improve the safety, function, cyclist prioritisation and separation from traffic and pedestrians.

The Wave Stage 2

Client

Laing O’Rourke

Project Value

$6BN

Engagement Period

Dec 2025 – Mar 2026

Project Overview

The Wave Stage 2 forms part of the Queensland Governments broader Sunshine Coast public transport program. The Wave Stage 2 is approximately 7km of dual-track rail extension which includes Aroona and Birtinya stations, Birtinya stabling facilities, a tunnel through Little Mountain, elevated rail structures and road interfaces.

HBD & Australia Avenue Upgrade

Client

BMD

Project Value

$246M

Engagement Period

May – Sep 2026

Project Overview

The Homebush Bay Drive and Australia Avenue (HBDAA) Intersection Upgrade is a Transport for NSW project at Sydney Olympic Park, upgrading the intersection, ramps and approaches along Australia Avenue and Underwood Road. BMD Constructions engaged Croí during the Early Contractor Involvement (ECI) phase to provide utilities design and management services for their tender.

Canberra Aquatic Centre

Client

iCBR

Project Value

$138M

Engagement Period

2026 - Present

Project Overview

Infrastructure Canberra is delivering the new Canberra Aquatic Centre (CAC) in Commonwealth Park, a 50-metre indoor aquatic facility for the ACT community. Croí was engaged as Utilities Advisor for the Approvals and Design phase, leading the utilities strategy, scope definition and stakeholder engagement to support NCA and EPBC approvals.

Henry Lawson Drive Stage 1B

Client

Laing O'Rourke

Project Value

Engagement Period

March to April 2026

Project Overview

Henry Lawson Drive Stage 1B is a Transport for NSW project for the upgrade of approximately 1.8 km of Henry Lawson Drive, extending from the M5 Motorway at the southern end to Auld Avenue at the northern end, located within Milperra in the city of Canterbury-Bankstown LGA. Laing O'Rourke engaged Croí during the Early Contractor Involvement (ECI) phase to provide utilities management services for their tender.

Bandon Road Upgrade and Extension S3&4

Client

Gamuda for TfNSW

Project Value

$400M

Engagement Period

8 Months

Project Overview

The Bandon Road Corridor Upgrade and Extension Sections 3 & 4 project is a design-and-construct package managed by Transport for NSW from Riverstone West Spine Road to Windsor Road, part of the North West Growth Centre. Key features include an upgraded rail crossing north of Vineyard Train Station, 4 lane carriageway, new connector roads and off-road shared path for pedestrians and cyclists.

Elizabeth Drive & Mamre Road Upgrade

Client

Gamuda (TfNSW)

Project Value

$1BN

Engagement Period

2026 – Ongoing

Project Overview

Transport for NSW is upgrading two key corridors supporting the Western Sydney International Airport and Aerotropolis: 14 km of Elizabeth Drive (The Northern Road to the M7) and 6.1 km of Mamre Road (Erskine Park Road to Kerrs Road), each to a four-lane divided carriageway with provision for six lanes. Croí is delivering utility detailed design and stakeholder management for Gamuda across both roads, with a separate design for each.

Epping Bridge Project

Client

Laing O'Rourke

Project Value

$220M

Engagement Period

Jun 2025 – Sep 2025

Project Overview

The Epping Bridge Project is a TfNSW project replacing the 124-year-old Epping Road bridge over the Northern Railway line with a new, wider bridge. The project contains complex staged utility relocations across the bridge and Blaxland Road. Laing O’Rourke (LOR) engaged Croí during the Early Contractor Involvement (ECI) phase to provide utilities management and concept design services for their tender.

Botany Industrial Park

Client

BIP Co Landowners Group & ESR

Project Value

Engagement Period

Feb 2025 – Present

Project Overview

The Botany Industrial Park covers approximately 60 hectares of land and has historically been used as a manufacturing plant. It is recognised as the third largest chemical manufacturing site across all of Australia. Most manufacturing operations ceased in 2024, and the available lots of land are now looking to be developed into serviceable buildings.

Wyong Town Centre Upgrade

Client

DGJV

Project Value

$400M

Engagement Period

Feb 2026 – May 2026

Project Overview

The Pacific Highway Upgrade through Wyong Town Centre is a TfNSW project, widening the highway through the town centre with new intersections, bridges and pedestrian and cycle paths. The project contains complex utility relocations and staging. Daracon Georgiou Joint Venture (DGJV) engaged Croí during the Early Contractor Involvement (ECI) phase to provide utilities management and concept design services for their tender.

Ryde Hospital – ASP3 Designs

Client

A.W. Edwards

Project Value

$479M

Engagement Period

2025 – 2026

Project Overview

Croí was engaged by A.W. Edwards, head contractor for Health Infrastructure's Ryde Hospital Redevelopment for ASP3 design works. The redevelopment includes the design and construction of new hospital buildings and the refurbishment of existing hospital spaces. This included the relocation of an Ausgrid 66kV sub-transmission pole on Denistone Road.

Parramatta Integrated Station Development

Client

Riverside

Project Value

$880M

Engagement Period

2025 - Present

Project Overview

Part of Sydney Metro West, Parramatta integrates a new underground station with over and adjacent station development (OSD/ASD) and public domain works. Croí supported the Gamuda-led consortium at tender and is now delivering utility design and approvals for the station and OSD/ASD connections.

Four-Mile Creek Stage 1

Client

Tactical Group and Bloomfield

Project Value

Engagement Period

2025 - Ongoing

Project Overview

Four Mile Creek Stage 1 is a 570-hectare staged industrial development with large-format warehousing, rail manufacturing and maintenance facilities, an intermodal terminal and a northern gateway commercial precinct. Early works are planned to start in late 2029. Croí prepared the Utility Risk and Opportunities Report covering electrical, water, wastewater and telecommunications servicing.

Essential Energy EV Charging

Client

Essential Energy

Project Value

$2M

Engagement Period

2025 - Present

Project Overview

Essential Energy is actively driving the expansion of electric vehicle (EV) charging infrastructure across regional New South Wales through a series of innovative trials and strategic collaborations. The electricity distributor is focusing on leveraging existing network assets to provide cost-effective and accessible charging solutions, supporting the NSW Government's EV Strategy.

SYD12 – HV Supply

Client

Digital Realty

Project Value

$140,360

Engagement Period

Dec 2024 – Ongoing

Project Overview

Croí was engaged by Digital Realty to deliver the Ausgrid ASP3 design for the Stage 1 load connection (approx. 20 MW) of the new 72.5 MW SYD12 data centre at 23 Waterloo Road, Macquarie Park. The design provides twin 11 kV feeders from Top Ryde and Lane Cove zone substations (approx. 6 km each), enabling staged supply ahead of Ausgrid’s planned Wallumatta STS.

Ryde-Pymble Trunkmain No.3 (RP03)

Client

Sydney Water

Project Value

$250M

Engagement Period

Oct 2024 - Present

Project Overview

The RP03 project involves the replacement of over 10 kilometres of DN900 water main from Ryde Pump Station to Wahroonga Reservoir in Sydney's northern suburbs, traversing heavily congested urban environments with thousands of existing utility interfaces.

Loganlea Station Relocation

Client

MDJV

Project Value

$180M

Engagement Period

Oct 2024 - Present

Project Overview

Part of the $5.75B Logan and Gold Coast Faster Rail program, the project relocates Loganlea station 500 m south to a new site opposite Logan Hospital. Delivered by the Martinus Degnan Joint Venture (MDJV) for TMR, it includes a new station building and platforms, a pedestrian overpass with lifts, and bus and park ’n’ ride facilities, with the existing station kept open throughout. Croí was engaged by MDJV to manage Public Utility Plant (PUP) for the Station and Civils Package.

Southwest Metro Errant and Hostile Vehicle Works (CIRA)

Client

Martinus Rail

Project Value

$120M

Engagement Period

Sep 2024 – Jul 2025

Project Overview

The Errant and Hostile Vehicle Mitigation project part of the Southwest Metro project will see the design and installation of treatment strategies on 15 bridges and 66 locations along the converted Sydenham-to-Bankstown Metro line. These protective measures ensure driverless Sydney Metro services are safe for passengers and that the 130-year-old corridor meets modern safety standards

Digital Realty

Client

Digital Realty

Project Value

Engagement Period

Aug 2024 - Present

Project Overview

Digital Realty operates more than 300 data centres across over 25 countries, providing secure, high-capacity infrastructure for storing and running IT workloads. One of these facilities, SYD11, is located in Erskine Park, NSW, and offers over 3,300 m² of customer space. As part of a capacity expansion at the site, both SYD11 and the nearby SYD14 required an upgrade in electrical load capacity. This increase necessitated the installation of additional feeders, supplied by the local energy provider, Endeavour Energy.

Sydney Metro – WTP

Client

Gamuda / Laing O'Rourke

Project Value

$2.1BN

Engagement Period

Jul 2024 - Sep 2025

Project Overview

The Western Tunnelling Package (WTP) is a major component of the Sydney Metro expansion, delivering around nine kilometres of twin tunnels between Westmead and Sydney Olympic Park, plus two spur tunnels. Scope includes station box excavations at Westmead and Parramatta, mined tunnels and caverns, tunnel portals at Clyde Stabling and Maintenance Facility, shaft construction, crossover structures, ventilation and egress facilities, utilities works, road modifications, and the establishment of a precast facility at Eastern Creek.

Sydney Desalination Plant Network Expansion

Client

Sydney Water

Project Value

$1BN

Engagement Period

Jan 2024 - Present

Project Overview

The Sydney Desalination Plant Network Expansion (SDPNE) project seeks to enhance water resilience, mitigate risks, and augment capacity. Positioned as the inaugural project under the Reliable Water Supply program, SDPNE involves network augmentation required to transfer an increase of 250 ML/d output from the Sydney Desalination Plant into the wider potable water network.

SYD14 Data Centre – ASP3 HV Design

Client

Digital Realty

Project Value

Engagement Period

2024 - Ongoing

Project Overview

Croí was engaged by Digital Realty to design the HV supply upgrade for its SYD14 Data Centre at 16 Lockwood Road, Erskine Park. Croí worked with Endeavour Energy to define the connection methodology and delivered a certified Level 3 (ASP3) design for a new twin-cabled feeder (MM1212 Digital Realty No. 6 to SS-55394), then was retained to support through construction of the ASP Level 1 works.

SYD11 Data Centre – ASP3 HV Designs

Client

Digital Realty

Project Value

Engagement Period

2024 - Ongoing

Project Overview

Croí was engaged by Digital Realty to deliver the HV utility upgrade for its SYD11 Data Centre at Templar Road, Erskine Park. Croí completed the Endeavour Energy twin-feeder design as a certified Level 3 (ASP3) design, then was retained to support Area 3 through construction of the ASP Level 1 works.

River Torrens to Darlington (T2D)

Client

CPB / ACCIONA

Project Value

$15.4BN

Engagement Period

Oct 2023 - Mar 2024

Project Overview

The T2D Project is the final 10.5km section of Adelaide’s North-South Corridor, and will complete 78km of non-stop, traffic light-free motorway between Gawler and Old Noarlunga. When complete, more than 50% of the T2D Project will be tunnels.

Parramatta Light Rail – Stage 1

Client

TfNSW

Project Value

$2.9Bn

Engagement Period

Nov 2020 - Jan 2024

Project Overview

The Parramatta Light Rail Stage 1 project involved extensive utilities management across a 12 km corridor in a densely serviced urban environment. The route intersected major water, gas, electrical, and telecommunication assets, requiring detailed service investigations, stakeholder engagement, and complex coordination. Utilities relocation and protection strategies were developed in collaboration with asset owners to minimise service disruptions and ensure construction feasibility.

Sydney Metro West

Client

Sydney Metro

Project Value

$28BN

Engagement Period

Nov 2017 - Jun 2024

Project Overview

The Sydney Metro West Project (SMW) consists of 24 kilometres of underground rail and the development of 7 new stations between Westmead and the Sydney CBD, with a Maintenance and Stabling Facility at Clyde. Sydney Metro West will double the rail capacity between Parramatta and the Sydney CBD.

Sydney Metro – City & Southwest

Client

Sydney Metro

Project Value

$21BN

Engagement Period

Oct 2015 - May 2024

Project Overview

A 30 kilometre extension of metro rail from the end of Sydney Metro Northwest at Chatswood under Sydney Harbour, through new CBD stations and south west to Bankstown. The City portion from Chatswood to Sydenham opened in 2024 with seven new metro stations. The remaining Southwest portion featuring 11 upgraded stations is due to open in 2026.

Canberra Light Rail – Stages 1, 2A and 2B

Client

iCBR (MPC)

Project Value

$1.3BN

Engagement Period

Sep 2014 - Present

Project Overview

The Canberra Light Rail Stages 1, 2A & 2B projects have a combined project value of $1.3Bn. Canberra Light Rail Stage 1 is from Gungahlin to City which is 12 kilometres and 13 stations. Canberra Light Rail Stage 2A is from City to Commonwealth Ave which is 1.7 kilometres and 3 stations and Early Works package – Raising London Circuit. Canberra Light Rail Stage 2B is from Commonwealth Avenue to Woden.

Why It Matters

Less rework

Clashes and conflicts resolved in design, not in the trench.

Faster approvals

Compliant designs prepared with authority requirements in mind.

Better buildability

Practical, field-ready solutions that work in real-world conditions.
Bundle Services

Find the right combination

Pair with Digital Engineering & Technical Modelling for 3D clash detection, or with Utilities Project Management to carry your design through approvals and construction.