Our Services

Site Readiness & Delivery Management

Ready on site. In control on the day.

Field intelligence, on-site leadership and real-time oversight for safe, compliant and efficient infrastructure works.

The gap between the design office and the work site is where risk becomes real. Unknown services, poorly sequenced works and weak supervision put safety, compliance and program at risk.

Our field-based team closes that gap. From early site investigations through to construction, we bring the technical intelligence and on-site leadership that keep works safe, compliant and moving.

Core Capabilities

Site investigations

Managing the subcontractors who carry out locating, potholing and survey.

Digital field intelligence

Drones, aerial imaging, VR, laser scanning and real-time monitoring.

Site management and monitoring

Construction supervision, compliance and stakeholder coordination.

Construction-phase management

Sequencing, staging, risk mitigation and interface management.
Capabilitiy in practice

Our Site Readiness & Delivery Management Work

New Albion Station

Client

Martinus Rail

Project Value

Engagement Period

Oct 2025 - Present

Project Overview

The Queensland Department of Transport and Main Roads is rebuilding Albion Station in Brisbane's inner north as a rail-to-rail interchange, ahead of Cross River Rail services. The new station will have four wider, raised platforms, an elevated southern concourse, a northern pedestrian overbridge, and a modern station building with lifts, accessible facilities and improved passenger amenities.

EnergyCo – CWO

Client

EnergyCo

Project Value

$5.5BN

Engagement Period

2025 - Present

Project Overview

The $5.5 billion project Central-West Orana Renewable Energy Zone in NSW is Australia’s first declared REZ, covering about 20,000 km² around Dubbo and Dunedoo, and will deliver up to 6 GW of network capacity by 2038 to connect wind, solar, and storage projects to the grid.

Loganlea Station Relocation

Client

MDJV

Project Value

$180M

Engagement Period

Oct 2024 - Present

Project Overview

Part of the $5.75B Logan and Gold Coast Faster Rail program, the project relocates Loganlea station 500 m south to a new site opposite Logan Hospital. Delivered by the Martinus Degnan Joint Venture (MDJV) for TMR, it includes a new station building and platforms, a pedestrian overpass with lifts, and bus and park ’n’ ride facilities, with the existing station kept open throughout. Croí was engaged by MDJV to manage Public Utility Plant (PUP) for the Station and Civils Package.

Sydney Metro Stations Package West

Client

Lendlease

Project Value

$2BN

Engagement Period

Jul 2024 – May 2025

Project Overview

The Sydney Metro West is a new 24km metro alignment from Westmead into Sydney CBD. The Stations Package West project is the design and construction contract for 5 stations along the alignment (Westmead, North Strathfield, Burwood North, The Bays and Five Dock).

Sydney Metro – WTP

Client

Gamuda / Laing O'Rourke

Project Value

$2.1BN

Engagement Period

Jul 2024 - Sep 2025

Project Overview

The Western Tunnelling Package (WTP) is a major component of the Sydney Metro expansion, delivering around nine kilometres of twin tunnels between Westmead and Sydney Olympic Park, plus two spur tunnels. Scope includes station box excavations at Westmead and Parramatta, mined tunnels and caverns, tunnel portals at Clyde Stabling and Maintenance Facility, shaft construction, crossover structures, ventilation and egress facilities, utilities works, road modifications, and the establishment of a precast facility at Eastern Creek.

Inland Rail — Albury to Parkes

Client

Martinus Rail

Project Value

$403.5m

Engagement Period

2024 – 2025

Project Overview

Inland Rail's Albury to Parkes (A2P) project upgrades about 355 km of existing track so double-stacked freight trains can run between Albury and Parkes. Martinus Rail delivered the works for ARTC and engaged Croí for specialist utilities management to reduce major utility risks including Jemena and APA gas risks through to construction.

Parramatta Light Rail – Stage 1

Client

TfNSW

Project Value

$2.9Bn

Engagement Period

Nov 2020 - Jan 2024

Project Overview

The Parramatta Light Rail Stage 1 project involved extensive utilities management across a 12 km corridor in a densely serviced urban environment. The route intersected major water, gas, electrical, and telecommunication assets, requiring detailed service investigations, stakeholder engagement, and complex coordination. Utilities relocation and protection strategies were developed in collaboration with asset owners to minimise service disruptions and ensure construction feasibility.

Sydney Metro – WSA

Client

Sydney Metro

Project Value

$11BN

Engagement Period

Nov 2018 - Jun 2024

Project Overview

The Sydney Metro – Western Sydney Airport (SM-WSA) project will construct a new 23km metro railway and 6 new stations between St Marys to the Western Sydney Aerotropolis (Bradfield) via the new Western Sydney International (Nancy-Bird Walton) Airport.

Sydney Metro West

Client

Sydney Metro

Project Value

$28BN

Engagement Period

Nov 2017 - Jun 2024

Project Overview

The Sydney Metro West Project (SMW) consists of 24 kilometres of underground rail and the development of 7 new stations between Westmead and the Sydney CBD, with a Maintenance and Stabling Facility at Clyde. Sydney Metro West will double the rail capacity between Parramatta and the Sydney CBD.

Sydney Metro – City & Southwest

Client

Sydney Metro

Project Value

$21BN

Engagement Period

Oct 2015 - May 2024

Project Overview

A 30 kilometre extension of metro rail from the end of Sydney Metro Northwest at Chatswood under Sydney Harbour, through new CBD stations and south west to Bankstown. The City portion from Chatswood to Sydenham opened in 2024 with seven new metro stations. The remaining Southwest portion featuring 11 upgraded stations is due to open in 2026.

Canberra Light Rail – Stages 1, 2A and 2B

Client

iCBR (MPC)

Project Value

$1.3BN

Engagement Period

Sep 2014 - Present

Project Overview

The Canberra Light Rail Stages 1, 2A & 2B projects have a combined project value of $1.3Bn. Canberra Light Rail Stage 1 is from Gungahlin to City which is 12 kilometres and 13 stations. Canberra Light Rail Stage 2A is from City to Commonwealth Ave which is 1.7 kilometres and 3 stations and Early Works package – Raising London Circuit. Canberra Light Rail Stage 2B is from Commonwealth Avenue to Woden.

Why It Matters

Safer works

Better ground knowledge before excavation starts.

Improved constructability

Works sequenced and staged to suit real site conditions.

Seamless transition

A clean link from early investigations to field execution.
Bundle Services

Find the right combination

Works hand in hand with Digital Engineering & Technical Modelling for live field data, and with Utilities Project Management for end-to-end utilities control.