SYD11 Data Centre – ASP3 HV Designs

Project Brief

Client: Digital Realty
Engagement Period: 2024 - Ongoing
Croí was engaged by Digital Realty to deliver the HV utility upgrade for its SYD11 Data Centre at Templar Road, Erskine Park. Croí completed the Endeavour Energy twin-feeder design as a certified Level 3 (ASP3) design, then was retained to support Area 3 through construction of the ASP Level 1 works.
Download Project Sheet

Involvement

Croí personnel were involved in:

  • Design certification
  • Site due diligence and photo record
  • Cable pulling and de-rating calculations
  • HV twin feeder design to ASP3 certification
  • Safety in Design and environmental reporting
  • Council, owner and TfNSW notifications
  • Construction support: RFIs and site inspections

Key Achievements

  • Certified ASP3 Endeavour Energy design ahead of programme.
  • Confirmed joint locations and feeder ratings through cable pulling and de-rating calculations
  • Design validated through Croí’s verification and constructability QA before certification
  • Retained by Digital Realty for a second engagement supporting Area 3 through construction
  • Common SS-55394 interface managed across the SYD11 and SYD14 feeder designs

Key Interfaces

  • Digital Realty (Design & Construction)
  • Area 3 (construction manager)
  • Endeavour Energy
  • Ultegra (previous designer)
  • Penrith City Council
  • Transport for NSW and adjacent property owners

Key Benefits

  • Certified Level 3 design for twin-cabled HV feeder MM1142 to SS-55394
  • Upgraded HV supply to support SYD11 data centre load
  • Endeavour-compliant package incl. Safety in Design and environmental reporting
  • Responsive technical support keeping ASP Level 1 construction moving