Our Projects

Four-Mile Creek Stage 1

Project Brief

Client: Tactical Group and Bloomfield
Engagement Period: 2025 - Ongoing
Four Mile Creek Stage 1 is a 570-hectare staged industrial development with large-format warehousing, rail manufacturing and maintenance facilities, an intermodal terminal and a northern gateway commercial precinct. Early works are planned to start in late 2029. Croí prepared the Utility Risk and Opportunities Report covering electrical, water, wastewater and telecommunications servicing.
Download Project Sheet

Involvement

Croí personnel were involved in:

  • Electrical maximum demand assessment for Phases 1A to 1J to AS/NZS 3000
  • Potable water and wastewater demand estimates
  • Temporary builder’s supply and permanent supply options
  • Water, wastewater, recycled water and telecommunications servicing strategies
  • Utility risk and opportunity assessment
  • Utility authority engagement and recommendations

Key Achievements

  • Confirmed available electrical supply capacity
  • Flagged the risk of losing capacity to nearby developments
  • Showed the risk of lodging the Endeavour Energy application too late for the project’s timeline
  • Prompted the client’s long-term utility planning

Key Interfaces

  • Ausgrid (electrical network)
  • Hunter Water (water and wastewater)
  • NBN Co (telecommunications)
  • The Bloomfield Group (Client – Existing Mine Network Owners)

Key Benefits

  • Recommendations setting the next steps for utility servicing
  • Electrical ownership model (Ausgrid or private embedded network) flagged as the critical decision before concept design
  • Existing TBG mine networks reserved for Stage 2 and later phases
  • Opportunities identified in early capacity reservation, solar and BESS, and embedded network revenue