Project Brief
Client: Sydney Water
Project Value: $500M
Engagement Period: XXX
The Quakers Hill Purified Recycled Water project includes the upgrading of the outflows from the Quakers Hill Water Resource Recovery Facility to Australian Guidelines for Water Recycling (AGWR) phase 2 quality as well as network augmentation to transport treated water to Prospect Reservoir, associated tank infrastructure, and a brine discharge line. The 14km pipeline between Quakers Hill and Prospect Reservoir will interface with numerous existing utilities, posing significant risks that must be managed carefully during design and construction to ensure project success.
Download Project Sheet
Involvement
Croí personnel conducted a utilities impact assessment for the preferred proposed pipeline alignment from Bungarribee Road to Prospect Reservoir.
Involvement included:
- Digital engineering
- Clash detection and impact assessment
- Provide subject matter expert advice
- Risk assessment
Key Achievements
- Identify major utilities interface risks associated with the preferred alignment and provide utilities information in an easily understood format for use as reference by the concept design service provider.
Key Interfaces
- Sydney Water
Key Benefits
- Identify major utilities interface risks associated with the preferred alignment and provide utilities information in an easily understood format for use as reference by the concept design service provider.