Digital Engineering & Technical Modelling

See the risk before you dig.

Advanced modelling, spatial intelligence and clash detection that make every design decision sharper.

What’s underground, what’s planned and what’s already built rarely line up neatly. Decisions made on incomplete or disconnected data lead to clashes, redesign and costly surprises on site.

Our dedicated digital team turns survey data, GIS and design inputs into accurate 3D models and spatial intelligence. It gives your designers, managers and field crews a single, reliable picture of the project.

Core Capabilities

3D modelling and digital twins

A living model of your assets and works.

GIS and utilities mapping

Accurate spatial records of existing and proposed services.

Clash detection

Conflicts identified and resolved before construction.

vGIS augmented reality

Underground services visualised on site, in real time.

Survey data management

Survey inputs captured, validated and kept in one place.
Capabilitiy in practice

Our Digital Engineering & Technical Modelling Work

New Albion Station

Client

Martinus Rail

Project Value

Engagement Period

Oct 2025 - Present

Project Overview

The Queensland Department of Transport and Main Roads is rebuilding Albion Station in Brisbane's inner north as a rail-to-rail interchange, ahead of Cross River Rail services. The new station will have four wider, raised platforms, an elevated southern concourse, a northern pedestrian overbridge, and a modern station building with lifts, accessible facilities and improved passenger amenities.

The Wave Stage 2

Client

Laing O’Rourke

Project Value

$6BN

Engagement Period

Dec 2025 – Mar 2026

Project Overview

The Wave Stage 2 forms part of the Queensland Governments broader Sunshine Coast public transport program. The Wave Stage 2 is approximately 7km of dual-track rail extension which includes Aroona and Birtinya stations, Birtinya stabling facilities, a tunnel through Little Mountain, elevated rail structures and road interfaces.

HBD & Australia Avenue Upgrade

Client

BMD

Project Value

$246M

Engagement Period

May – Sep 2026

Project Overview

The Homebush Bay Drive and Australia Avenue (HBDAA) Intersection Upgrade is a Transport for NSW project at Sydney Olympic Park, upgrading the intersection, ramps and approaches along Australia Avenue and Underwood Road. BMD Constructions engaged Croí during the Early Contractor Involvement (ECI) phase to provide utilities design and management services for their tender.

Bandon Road Upgrade and Extension S3&4

Client

Gamuda for TfNSW

Project Value

$400M

Engagement Period

8 Months

Project Overview

The Bandon Road Corridor Upgrade and Extension Sections 3 & 4 project is a design-and-construct package managed by Transport for NSW from Riverstone West Spine Road to Windsor Road, part of the North West Growth Centre. Key features include an upgraded rail crossing north of Vineyard Train Station, 4 lane carriageway, new connector roads and off-road shared path for pedestrians and cyclists.

Elizabeth Drive & Mamre Road Upgrade

Client

Gamuda (TfNSW)

Project Value

$1BN

Engagement Period

2026 – Ongoing

Project Overview

Transport for NSW is upgrading two key corridors supporting the Western Sydney International Airport and Aerotropolis: 14 km of Elizabeth Drive (The Northern Road to the M7) and 6.1 km of Mamre Road (Erskine Park Road to Kerrs Road), each to a four-lane divided carriageway with provision for six lanes. Croí is delivering utility detailed design and stakeholder management for Gamuda across both roads, with a separate design for each.

Epping Bridge Project

Client

Laing O'Rourke

Project Value

$220M

Engagement Period

Jun 2025 – Sep 2025

Project Overview

The Epping Bridge Project is a TfNSW project replacing the 124-year-old Epping Road bridge over the Northern Railway line with a new, wider bridge. The project contains complex staged utility relocations across the bridge and Blaxland Road. Laing O’Rourke (LOR) engaged Croí during the Early Contractor Involvement (ECI) phase to provide utilities management and concept design services for their tender.

Wyong Town Centre Upgrade

Client

DGJV

Project Value

$400M

Engagement Period

Feb 2026 – May 2026

Project Overview

The Pacific Highway Upgrade through Wyong Town Centre is a TfNSW project, widening the highway through the town centre with new intersections, bridges and pedestrian and cycle paths. The project contains complex utility relocations and staging. Daracon Georgiou Joint Venture (DGJV) engaged Croí during the Early Contractor Involvement (ECI) phase to provide utilities management and concept design services for their tender.

Quakers Hill – Purified Recycled Water Scheme

Client

Sydney Water

Project Value

$500M

Engagement Period

Project Overview

The Quakers Hill Purified Recycled Water project includes the upgrading of the outflows from the Quakers Hill Water Resource Recovery Facility to Australian Guidelines for Water Recycling (AGWR) phase 2 quality as well as network augmentation to transport treated water to Prospect Reservoir, associated tank infrastructure, and a brine discharge line. The 14km pipeline between Quakers Hill and Prospect Reservoir will interface with numerous existing utilities, posing significant risks that must be managed carefully during design and construction to ensure project success.

Parramatta Integrated Station Development

Client

Riverside

Project Value

$880M

Engagement Period

2025 - Present

Project Overview

Part of Sydney Metro West, Parramatta integrates a new underground station with over and adjacent station development (OSD/ASD) and public domain works. Croí supported the Gamuda-led consortium at tender and is now delivering utility design and approvals for the station and OSD/ASD connections.

Ryde-Pymble Trunkmain No.3 (RP03)

Client

Sydney Water

Project Value

$250M

Engagement Period

Oct 2024 - Present

Project Overview

The RP03 project involves the replacement of over 10 kilometres of DN900 water main from Ryde Pump Station to Wahroonga Reservoir in Sydney's northern suburbs, traversing heavily congested urban environments with thousands of existing utility interfaces.

Loganlea Station Relocation

Client

MDJV

Project Value

$180M

Engagement Period

Oct 2024 - Present

Project Overview

Part of the $5.75B Logan and Gold Coast Faster Rail program, the project relocates Loganlea station 500 m south to a new site opposite Logan Hospital. Delivered by the Martinus Degnan Joint Venture (MDJV) for TMR, it includes a new station building and platforms, a pedestrian overpass with lifts, and bus and park ’n’ ride facilities, with the existing station kept open throughout. Croí was engaged by MDJV to manage Public Utility Plant (PUP) for the Station and Civils Package.

Southwest Metro Errant and Hostile Vehicle Works (CIRA)

Client

Martinus Rail

Project Value

$120M

Engagement Period

Sep 2024 – Jul 2025

Project Overview

The Errant and Hostile Vehicle Mitigation project part of the Southwest Metro project will see the design and installation of treatment strategies on 15 bridges and 66 locations along the converted Sydenham-to-Bankstown Metro line. These protective measures ensure driverless Sydney Metro services are safe for passengers and that the 130-year-old corridor meets modern safety standards

Sydney Metro – WTP

Client

Gamuda / Laing O'Rourke

Project Value

$2.1BN

Engagement Period

Jul 2024 - Sep 2025

Project Overview

The Western Tunnelling Package (WTP) is a major component of the Sydney Metro expansion, delivering around nine kilometres of twin tunnels between Westmead and Sydney Olympic Park, plus two spur tunnels. Scope includes station box excavations at Westmead and Parramatta, mined tunnels and caverns, tunnel portals at Clyde Stabling and Maintenance Facility, shaft construction, crossover structures, ventilation and egress facilities, utilities works, road modifications, and the establishment of a precast facility at Eastern Creek.

Sydney Desalination Plant Network Expansion

Client

Sydney Water

Project Value

$1BN

Engagement Period

Jan 2024 - Present

Project Overview

The Sydney Desalination Plant Network Expansion (SDPNE) project seeks to enhance water resilience, mitigate risks, and augment capacity. Positioned as the inaugural project under the Reliable Water Supply program, SDPNE involves network augmentation required to transfer an increase of 250 ML/d output from the Sydney Desalination Plant into the wider potable water network.

River Torrens to Darlington (T2D)

Client

CPB / ACCIONA

Project Value

$15.4BN

Engagement Period

Oct 2023 - Mar 2024

Project Overview

The T2D Project is the final 10.5km section of Adelaide’s North-South Corridor, and will complete 78km of non-stop, traffic light-free motorway between Gawler and Old Noarlunga. When complete, more than 50% of the T2D Project will be tunnels.

Parramatta Light Rail – Stage 1

Client

TfNSW

Project Value

$2.9Bn

Engagement Period

Nov 2020 - Jan 2024

Project Overview

The Parramatta Light Rail Stage 1 project involved extensive utilities management across a 12 km corridor in a densely serviced urban environment. The route intersected major water, gas, electrical, and telecommunication assets, requiring detailed service investigations, stakeholder engagement, and complex coordination. Utilities relocation and protection strategies were developed in collaboration with asset owners to minimise service disruptions and ensure construction feasibility.

Sydney Metro West

Client

Sydney Metro

Project Value

$28BN

Engagement Period

Nov 2017 - Jun 2024

Project Overview

The Sydney Metro West Project (SMW) consists of 24 kilometres of underground rail and the development of 7 new stations between Westmead and the Sydney CBD, with a Maintenance and Stabling Facility at Clyde. Sydney Metro West will double the rail capacity between Parramatta and the Sydney CBD.

Canberra Light Rail – Stages 1, 2A and 2B

Client

iCBR (MPC)

Project Value

$1.3BN

Engagement Period

Sep 2014 - Present

Project Overview

The Canberra Light Rail Stages 1, 2A & 2B projects have a combined project value of $1.3Bn. Canberra Light Rail Stage 1 is from Gungahlin to City which is 12 kilometres and 13 stations. Canberra Light Rail Stage 2A is from City to Commonwealth Ave which is 1.7 kilometres and 3 stations and Early Works package – Raising London Circuit. Canberra Light Rail Stage 2B is from Commonwealth Avenue to Woden.

Why It Matters

Design assurance

Decisions backed by accurate, connected data.

Fewer site surprises

Clashes caught digitally, not physically.

Transparent reporting

Clear visuals that keep every stakeholder on the same page.
Bundle Services

Find the right combination

The digital backbone for Utilities Strategy & Design and Site Readiness & Delivery Management, linking design intent to what happens in the field.