Henderson Road and Raglan Street Cycleway – Lighting Audit and ASP3 Design
Project Overview
This is a project from City of Sydney to extend the cycleway connection along Henderson Road and Raglan Street between the existing cycleway at the intersection of Davy/Mitchell Road and the existing cycleway at George Street. The project aims to improve the safety, function, cyclist prioritisation and separation from traffic and pedestrians.More Info
Elizabeth Drive & Mamre Road Upgrade
Project Overview
Transport for NSW is upgrading two key corridors supporting the Western Sydney International Airport and Aerotropolis: 14 km of Elizabeth Drive (The Northern Road to the M7) and 6.1 km of Mamre Road (Erskine Park Road to Kerrs Road), each to a four-lane divided carriageway with provision for six lanes. Croí is delivering utility detailed design and stakeholder management for Gamuda across both roads, with a separate design for each.More Info
SYD12 – HV Supply
Project Overview
Croí was engaged by Digital Realty to deliver the Ausgrid ASP3 design for the Stage 1 load connection (approx. 20 MW) of the new 72.5 MW SYD12 data centre at 23 Waterloo Road, Macquarie Park. The design provides twin 11 kV feeders from Top Ryde and Lane Cove zone substations (approx. 6 km each), enabling staged supply ahead of Ausgrid’s planned Wallumatta STS.More Info
Digital Realty
Project Overview
Digital Realty operates more than 300 data centres across over 25 countries, providing secure, high-capacity infrastructure for storing and running IT workloads. One of these facilities, SYD11, is located in Erskine Park, NSW, and offers over 3,300 m² of customer space. As part of a capacity expansion at the site, both SYD11 and the nearby SYD14 required an upgrade in electrical load capacity. This increase necessitated the installation of additional feeders, supplied by the local energy provider, Endeavour Energy.More Info
SYD14 Data Centre – ASP3 HV Design
Project Overview
Croí was engaged by Digital Realty to design the HV supply upgrade for its SYD14 Data Centre at 16 Lockwood Road, Erskine Park. Croí worked with Endeavour Energy to define the connection methodology and delivered a certified Level 3 (ASP3) design for a new twin-cabled feeder (MM1212 Digital Realty No. 6 to SS-55394), then was retained to support through construction of the ASP Level 1 works.More Info
SYD11 Data Centre – ASP3 HV Designs
Project Overview
Croí was engaged by Digital Realty to deliver the HV utility upgrade for its SYD11 Data Centre at Templar Road, Erskine Park. Croí completed the Endeavour Energy twin-feeder design as a certified Level 3 (ASP3) design, then was retained to support Area 3 through construction of the ASP Level 1 works.More Info
Sydney Metro West
Project Overview
The Sydney Metro West Project (SMW) consists of 24 kilometres of underground rail and the development of 7 new stations between Westmead and the Sydney CBD, with a Maintenance and Stabling Facility at Clyde. Sydney Metro West will double the rail capacity between Parramatta and the Sydney CBD.More Info