Ryde Hospital – ASP3 Designs

Project Overview

Croí was engaged by A.W. Edwards, head contractor for Health Infrastructure's Ryde Hospital Redevelopment for ASP3 design works. The redevelopment includes the design and construction of new hospital buildings and the refurbishment of existing hospital spaces. This included the relocation of an Ausgrid 66kV sub-transmission pole on Denistone Road.
More Info

Northside Hospital

Project Overview

Infrastructure Canberra is delivering the new Northside Hospital on the existing North Canberra Hospital campus in Bruce. Stage 1 includes a seven-storey clinical services building with 200+ inpatient beds. Croí was engaged as Utilities Advisor, leading the utilities strategy, scope definition and stakeholder engagement to support design and approvals on a live hospital campus.