Sydney Metro – City & Southwest

Project Overview

A 30 kilometre extension of metro rail from the end of Sydney Metro Northwest at Chatswood under Sydney Harbour, through new CBD stations and south west to Bankstown. The City portion from Chatswood to Sydenham opened in 2024 with seven new metro stations. The remaining Southwest portion featuring 11 upgraded stations is due to open in 2026.
More Info

Sydney Metro West

Project Overview

The Sydney Metro West Project (SMW) consists of 24 kilometres of underground rail and the development of 7 new stations between Westmead and the Sydney CBD, with a Maintenance and Stabling Facility at Clyde. Sydney Metro West will double the rail capacity between Parramatta and the Sydney CBD.
More Info

Canberra Light Rail

Project Overview

The Canberra Light Rail Stages 1, 2A & 2B projects have a combined project value of $1.3Bn, Canberra Light Rail Stage 1 is from Gungahlin to City which is 12 kilometres and 13 stations. Canberra Light Rail Stage 2A is from City to Commonwealth Ave which is 1.7 kilometres and 3 station and Early Works package – Raising Londen Circuit. Canberra Light Rail Stage 2B is from Commonwealth Avenue to Woden.
More Info

Sydney Metro – WTP

Project Overview

The Western Tunnelling Package (WTP) is a major component of the Sydney Metro expansion, delivering around nine kilometres of twin tunnels between Westmead and Sydney Olympic Park, plus two spur tunnels. Scope includes station box excavations at Westmead and Parramatta, mined tunnels and caverns, tunnel portals at Clyde Stabling and Maintenance Facility, shaft construction, crossover structures, ventilation and egress facilities, utilities works, road modifications, and the establishment of a precast facility at Eastern Creek.
More Info

Sydney Metro Stations Package West

Project Overview

The Sydney Metro West is a new 24km metro alignment from Westmead into Sydney CBD. The Stations Package West project is the design and construction contract for 5 stations along the alignment (Westmead, North Strathfield, Burwood North, The Bays and Five Dock).
More Info

Parramatta Light Rail – Stage 1

Project Overview

The Parramatta Light Rail Stage 1 project involved extensive utilities management across a 12 km corridor in a densely serviced urban environment. The route intersected major water, gas, electrical, and telecommunication assets, requiring detailed service investigations, stakeholder engagement, and complex coordination. Utilities relocation and protection strategies were developed in collaboration with asset owners to minimise service disruptions and ensure construction feasibility.
More Info

Sydney Metro – WSA

Project Overview

The Sydney Metro – Western Sydney Airport (SM-WSA) project will construct a new 23km metro railway and 6 new stations between St Marys to the Western Sydney Aerotropolis (Bradfield) via the new Western Sydney International (Nancy-Bird Walton) Airport.
More Info

Southwest Metro Errant and Hostile Vehicle Works (CIRA)

Project Overview

The Errant and Hostile Vehicle Mitigation project part of the Southwest Metro project will see the design and installation of treatment strategies on 15 bridges and 66 locations along the converted Sydenham-to-Bankstown Metro line. These protective measures ensure driverless Sydney Metro services are safe for passengers and that the 130-year-old corridor meets modern safety standards.
More Info