Our Work

Projects

Sort by sector

New Albion Station

Project Overview

The Queensland Department of Transport and Main Roads is rebuilding Albion Station in Brisbane's inner north as a rail-to-rail interchange, ahead of Cross River Rail services. The new station will have four wider, raised platforms, an elevated southern concourse, a northern pedestrian overbridge, and a modern station building with lifts, accessible facilities and improved passenger amenities.
More Info

Site Readiness & Delivery Management

Project Overview

More Info

EnergyCo – CWO

Project Overview

The $5.5 billion project Central-West Orana Renewable Energy Zone in NSW is Australia’s first declared REZ, covering about 20,000 km² around Dubbo and Dunedoo, and will deliver up to 6 GW of network capacity by 2038 to connect wind, solar, and storage projects to the grid.
More Info

Loganlea Station Relocation

Project Overview

Part of the $5.75B Logan and Gold Coast Faster Rail program, the project relocates Loganlea station 500 m south to a new site opposite Logan Hospital. Delivered by the Martinus Degnan Joint Venture (MDJV) for TMR, it includes a new station building and platforms, a pedestrian overpass with lifts, and bus and park ’n’ ride facilities, with the existing station kept open throughout. Croí was engaged by MDJV to manage Public Utility Plant (PUP) for the Station and Civils Package.
More Info

Sydney Metro Stations Package West

Project Overview

The Sydney Metro West is a new 24km metro alignment from Westmead into Sydney CBD. The Stations Package West project is the design and construction contract for 5 stations along the alignment (Westmead, North Strathfield, Burwood North, The Bays and Five Dock).
More Info

Sydney Metro – WTP

Project Overview

The Western Tunnelling Package (WTP) is a major component of the Sydney Metro expansion, delivering around nine kilometres of twin tunnels between Westmead and Sydney Olympic Park, plus two spur tunnels. Scope includes station box excavations at Westmead and Parramatta, mined tunnels and caverns, tunnel portals at Clyde Stabling and Maintenance Facility, shaft construction, crossover structures, ventilation and egress facilities, utilities works, road modifications, and the establishment of a precast facility at Eastern Creek.
More Info

Inland Rail — Albury to Parkes

Project Overview

Inland Rail's Albury to Parkes (A2P) project upgrades about 355 km of existing track so double-stacked freight trains can run between Albury and Parkes. Martinus Rail delivered the works for ARTC and engaged Croí for specialist utilities management to reduce major utility risks including Jemena and APA gas risks through to construction.
More Info

Parramatta Light Rail – Stage 1

Project Overview

The Parramatta Light Rail Stage 1 project involved extensive utilities management across a 12 km corridor in a densely serviced urban environment. The route intersected major water, gas, electrical, and telecommunication assets, requiring detailed service investigations, stakeholder engagement, and complex coordination. Utilities relocation and protection strategies were developed in collaboration with asset owners to minimise service disruptions and ensure construction feasibility.
More Info

Sydney Metro – WSA

Project Overview

The Sydney Metro – Western Sydney Airport (SM-WSA) project will construct a new 23km metro railway and 6 new stations between St Marys to the Western Sydney Aerotropolis (Bradfield) via the new Western Sydney International (Nancy-Bird Walton) Airport.
More Info

Sydney Metro West

Project Overview

The Sydney Metro West Project (SMW) consists of 24 kilometres of underground rail and the development of 7 new stations between Westmead and the Sydney CBD, with a Maintenance and Stabling Facility at Clyde. Sydney Metro West will double the rail capacity between Parramatta and the Sydney CBD.
More Info

Sydney Metro – City & Southwest

Project Overview

A 30 kilometre extension of metro rail from the end of Sydney Metro Northwest at Chatswood under Sydney Harbour, through new CBD stations and south west to Bankstown. The City portion from Chatswood to Sydenham opened in 2024 with seven new metro stations. The remaining Southwest portion featuring 11 upgraded stations is due to open in 2026.
More Info

Canberra Light Rail – Stages 1, 2A and 2B

Project Overview

The Canberra Light Rail Stages 1, 2A & 2B projects have a combined project value of $1.3Bn. Canberra Light Rail Stage 1 is from Gungahlin to City which is 12 kilometres and 13 stations. Canberra Light Rail Stage 2A is from City to Commonwealth Ave which is 1.7 kilometres and 3 stations and Early Works package – Raising London Circuit. Canberra Light Rail Stage 2B is from Commonwealth Avenue to Woden.
More Info