Our Work
Sort by sector
New Albion Station
Project Overview
The Queensland Department of Transport and Main Roads is rebuilding Albion Station in Brisbane's inner north as a rail-to-rail interchange, ahead of Cross River Rail services. The new station will have four wider, raised platforms, an elevated southern concourse, a northern pedestrian overbridge, and a modern station building with lifts, accessible facilities and improved passenger amenities.More Info
Zero Emission Buses
Project Overview
The TfNSW Zero Emission Bus program will deliver thousands of new electric buses and supporting depot infrastructure over the next 10 years. The program includes the transition of bus existing bus depots from diesel and CNG supply to 100% electrification. The first phase of the transition includes 10 depots across Sydney metropolitan area.More Info
The Wave Stage 2
Project Overview
The Wave Stage 2 forms part of the Queensland Governments broader Sunshine Coast public transport program. The Wave Stage 2 is approximately 7km of dual-track rail extension which includes Aroona and Birtinya stations, Birtinya stabling facilities, a tunnel through Little Mountain, elevated rail structures and road interfaces.More Info
HBD & Australia Avenue Upgrade
Project Overview
The Homebush Bay Drive and Australia Avenue (HBDAA) Intersection Upgrade is a Transport for NSW project at Sydney Olympic Park, upgrading the intersection, ramps and approaches along Australia Avenue and Underwood Road. BMD Constructions engaged Croí during the Early Contractor Involvement (ECI) phase to provide utilities design and management services for their tender.More Info
Canberra Aquatic Centre
Project Overview
Infrastructure Canberra is delivering the new Canberra Aquatic Centre (CAC) in Commonwealth Park, a 50-metre indoor aquatic facility for the ACT community. Croí was engaged as Utilities Advisor for the Approvals and Design phase, leading the utilities strategy, scope definition and stakeholder engagement to support NCA and EPBC approvals.More Info
Henry Lawson Drive Stage 1B
Project Overview
Henry Lawson Drive Stage 1B is a Transport for NSW project for the upgrade of approximately 1.8 km of Henry Lawson Drive, extending from the M5 Motorway at the southern end to Auld Avenue at the northern end, located within Milperra in the city of Canterbury-Bankstown LGA. Laing O'Rourke engaged Croí during the Early Contractor Involvement (ECI) phase to provide utilities management services for their tender.More Info
Bandon Road Upgrade and Extension S3&4
Project Overview
The Bandon Road Corridor Upgrade and Extension Sections 3 & 4 project is a design-and-construct package managed by Transport for NSW from Riverstone West Spine Road to Windsor Road, part of the North West Growth Centre. Key features include an upgraded rail crossing north of Vineyard Train Station, 4 lane carriageway, new connector roads and off-road shared path for pedestrians and cyclists.More Info
Elizabeth Drive & Mamre Road Upgrade
Project Overview
Transport for NSW is upgrading two key corridors supporting the Western Sydney International Airport and Aerotropolis: 14 km of Elizabeth Drive (The Northern Road to the M7) and 6.1 km of Mamre Road (Erskine Park Road to Kerrs Road), each to a four-lane divided carriageway with provision for six lanes. Croí is delivering utility detailed design and stakeholder management for Gamuda across both roads, with a separate design for each.More Info
Epping Bridge Project
Project Overview
The Epping Bridge Project is a TfNSW project replacing the 124-year-old Epping Road bridge over the Northern Railway line with a new, wider bridge. The project contains complex staged utility relocations across the bridge and Blaxland Road. Laing O’Rourke (LOR) engaged Croí during the Early Contractor Involvement (ECI) phase to provide utilities management and concept design services for their tender.More Info
Botany Industrial Park
Project Overview
The Botany Industrial Park covers approximately 60 hectares of land and has historically been used as a manufacturing plant. It is recognised as the third largest chemical manufacturing site across all of Australia. Most manufacturing operations ceased in 2024, and the available lots of land are now looking to be developed into serviceable buildings.More Info
WestConnex M8 Munni Street
Project Overview
Stormwater channel modifications at Euston Road, Alexandria, under the WestConnex M8 programme, to Sydney Water’s approved design. Croí supported procurement and contract development across commercial, technical and asset-owner interfaces.More Info
Wyong Town Centre Upgrade
Project Overview
The Pacific Highway Upgrade through Wyong Town Centre is a TfNSW project, widening the highway through the town centre with new intersections, bridges and pedestrian and cycle paths. The project contains complex utility relocations and staging. Daracon Georgiou Joint Venture (DGJV) engaged Croí during the Early Contractor Involvement (ECI) phase to provide utilities management and concept design services for their tender.More Info
Pyrmont Integrated Station Development
Project Overview
Part of Sydney Metro West, Pyrmont integrates a new underground station with development above it and surrounding public domain works. Croí supported the Gamuda-led bid team with utilities strategy, tender design coordination and commercial inputs.More Info
Parramatta Integrated Station Development
Project Overview
Part of Sydney Metro West, Parramatta integrates a new underground station with over and adjacent station development (OSD/ASD) and public domain works. Croí supported the Gamuda-led consortium at tender and is now delivering utility design and approvals for the station and OSD/ASD connections.More Info
Four-Mile Creek Stage 1
Project Overview
Four Mile Creek Stage 1 is a 570-hectare staged industrial development with large-format warehousing, rail manufacturing and maintenance facilities, an intermodal terminal and a northern gateway commercial precinct. Early works are planned to start in late 2029. Croí prepared the Utility Risk and Opportunities Report covering electrical, water, wastewater and telecommunications servicing.More Info
Electric Vessel Pilot Project
Project Overview
The EV24m project is a TfNSW initiative to trial zero-emission ferry technology on Sydney Harbour. It includes the design and construction of an electric ferry and dedicated onshore charging infrastructure at Barangaroo Wharf to support future electrification of the Sydney Ferries fleet. The trial will assess the technology's operational performance, safety and suitability for future electrification of the Sydney Ferries fleet.More Info
Ryde-Pymble Trunkmain No.3 (RP03)
Project Overview
The RP03 project involves the replacement of over 10 kilometres of DN900 water main from Ryde Pump Station to Wahroonga Reservoir in Sydney's northern suburbs, traversing heavily congested urban environments with thousands of existing utility interfaces.More Info
Loganlea Station Relocation
Project Overview
Part of the $5.75B Logan and Gold Coast Faster Rail program, the project relocates Loganlea station 500 m south to a new site opposite Logan Hospital. Delivered by the Martinus Degnan Joint Venture (MDJV) for TMR, it includes a new station building and platforms, a pedestrian overpass with lifts, and bus and park ’n’ ride facilities, with the existing station kept open throughout. Croí was engaged by MDJV to manage Public Utility Plant (PUP) for the Station and Civils Package.More Info
Southwest Metro Errant and Hostile Vehicle Works (CIRA)
Project Overview
The Errant and Hostile Vehicle Mitigation project part of the Southwest Metro project will see the design and installation of treatment strategies on 15 bridges and 66 locations along the converted Sydenham-to-Bankstown Metro line. These protective measures ensure driverless Sydney Metro services are safe for passengers and that the 130-year-old corridor meets modern safety standardsMore Info
Sydney Metro Stations Package West
Project Overview
The Sydney Metro West is a new 24km metro alignment from Westmead into Sydney CBD. The Stations Package West project is the design and construction contract for 5 stations along the alignment (Westmead, North Strathfield, Burwood North, The Bays and Five Dock).More Info
Sydney Metro – WTP
Project Overview
The Western Tunnelling Package (WTP) is a major component of the Sydney Metro expansion, delivering around nine kilometres of twin tunnels between Westmead and Sydney Olympic Park, plus two spur tunnels. Scope includes station box excavations at Westmead and Parramatta, mined tunnels and caverns, tunnel portals at Clyde Stabling and Maintenance Facility, shaft construction, crossover structures, ventilation and egress facilities, utilities works, road modifications, and the establishment of a precast facility at Eastern Creek.More Info
M6 Stage 1
Project Overview
The M6 Stage 1 project involves the construction of twin tunnels linking the M5 Motorway at Arncliffe to President Avenue at Kogarah. In 2024, a subsidence event resulted in tunnelling works being paused around West Botany Street in Rockdale. Further ground improvement works to the area necessitated additional utilities works to be completed.More Info
Sydney Desalination Plant Network Expansion
Project Overview
The Sydney Desalination Plant Network Expansion (SDPNE) project seeks to enhance water resilience, mitigate risks, and augment capacity. Positioned as the inaugural project under the Reliable Water Supply program, SDPNE involves network augmentation required to transfer an increase of 250 ML/d output from the Sydney Desalination Plant into the wider potable water network.More Info
Northside Hospital
Project Overview
Infrastructure Canberra is delivering the new Northside Hospital on the existing North Canberra Hospital campus in Bruce. Stage 1 includes a seven-storey clinical services building with 200+ inpatient beds. Croí was engaged as Utilities Advisor, leading the utilities strategy, scope definition and stakeholder engagement to support design and approvals on a live hospital campus.More Info
Inland Rail — Albury to Parkes
Project Overview
Inland Rail's Albury to Parkes (A2P) project upgrades about 355 km of existing track so double-stacked freight trains can run between Albury and Parkes. Martinus Rail delivered the works for ARTC and engaged Croí for specialist utilities management to reduce major utility risks including Jemena and APA gas risks through to construction.More Info
River Torrens to Darlington (T2D)
Project Overview
The T2D Project is the final 10.5km section of Adelaide’s North-South Corridor, and will complete 78km of non-stop, traffic light-free motorway between Gawler and Old Noarlunga. When complete, more than 50% of the T2D Project will be tunnels.More Info
Moorebank Logistics Park
Project Overview
The Moorebank Intermodal and Logistics Park (MLP) has direct rail access to Port Botany and will be an open access intermodal facility with a capacity of 1 million TEU (20ft containers) throughout per annum. This intermodal precinct is the largest in Australia and is a nationally significant infrastructure project helping transform how freight is moved around Australia.More Info
Melrose Park North Development
Project Overview
The $320m Melrose Park North is a 30-hectare brownfield development in City of Parramatta. The development is adding approximately 6,000 units and retail shopping centre, community spaces and parklands to the previously zoned industrial site.More Info
Parramatta Light Rail – Stage 1
Project Overview
The Parramatta Light Rail Stage 1 project involved extensive utilities management across a 12 km corridor in a densely serviced urban environment. The route intersected major water, gas, electrical, and telecommunication assets, requiring detailed service investigations, stakeholder engagement, and complex coordination. Utilities relocation and protection strategies were developed in collaboration with asset owners to minimise service disruptions and ensure construction feasibility.More Info
Sydney Metro – WSA
Project Overview
The Sydney Metro – Western Sydney Airport (SM-WSA) project will construct a new 23km metro railway and 6 new stations between St Marys to the Western Sydney Aerotropolis (Bradfield) via the new Western Sydney International (Nancy-Bird Walton) Airport.More Info
Sydney Metro West
Project Overview
The Sydney Metro West Project (SMW) consists of 24 kilometres of underground rail and the development of 7 new stations between Westmead and the Sydney CBD, with a Maintenance and Stabling Facility at Clyde. Sydney Metro West will double the rail capacity between Parramatta and the Sydney CBD.More Info
Sydney Metro – City & Southwest
Project Overview
A 30 kilometre extension of metro rail from the end of Sydney Metro Northwest at Chatswood under Sydney Harbour, through new CBD stations and south west to Bankstown. The City portion from Chatswood to Sydenham opened in 2024 with seven new metro stations. The remaining Southwest portion featuring 11 upgraded stations is due to open in 2026.More Info
Canberra Light Rail – Stages 1, 2A and 2B
Project Overview
The Canberra Light Rail Stages 1, 2A & 2B projects have a combined project value of $1.3Bn. Canberra Light Rail Stage 1 is from Gungahlin to City which is 12 kilometres and 13 stations. Canberra Light Rail Stage 2A is from City to Commonwealth Ave which is 1.7 kilometres and 3 stations and Early Works package – Raising London Circuit. Canberra Light Rail Stage 2B is from Commonwealth Avenue to Woden.More Info